Videos of driven pile installation with Bruce and Junttan hydraulic hammers, and drilling with Bauer RG-20 and RH-25 rigs on real construction sites.
High-productivity pile installation with adjustable impact energy.
High-speed driving of 14-metre prismatic piles.
Penetrating dense soils with an SO-2 drilling head.
Continuous flight auger (CFA) with simultaneous pressurised concrete supply.
Building the pile foundation of an industrial building with casing tubes.
Checking soil and pile bearing capacity using hydraulic jacks.
Determining pile refusals during test driving and rest.
Welding the joint and driving with a heavy hydraulic hammer in difficult soil conditions.
Silent, vibration-free technology next to existing buildings.
Installing piles by pressing with a force of up to 320 tonnes.
Cutting pile heads and preparing the base for pile caps with excavators.
Monolithic foundation works for the elevator process building.
Unloading and feeding piles to the pile driver on the construction site.
Forming an enclosing waterproof and load-bearing wall.
Handing over the completed facility to the general contractor's representatives.